Product model | CGS200K-100 | CGS100K-050 |
Energy storage parameter | ||
Rated power | 100kW | 50kW |
Nominal capacity | 200kWh | 100kWh |
Charge and discharge ratio | ≤0.5C | ≤0.5C |
Battery voltage range | 500~900V | |
Discharge depth | ≤95%DOD(suggestion) | |
Number of cycles | >5000 times | |
Cell type | 3.2V/173Ah, 3.2V/280Ah | |
Rated voltage | AC380/400V | |
Rated frequency | 50Hz | |
Operating temperature | -20~55℃ | |
Relative humidity | 5%~95%RH,Non-condensing cream | |
Altitude | 2000m | |
Noise | ≤60dB | |
Installation mode | Outdoor cabinet | |
Heat dissipation mode | Air conditioning, water cooling | |
Protection class | IP54 | |
Isolation mode | Non-isolation | |
Charging facility parameter | ||
Rated power | 120kW | 40kW |
Installation mode | Floor type | |
Input voltage | AC380V±15% | |
Output frequency | 45-65Hz | |
Output voltage range | 200-750Vdc | |
Output current range | 0-250A | 0-132A |
Operating temperature | -25~55℃ | |
Relative humidity | 5%~95%RH,Non-condensing cream | |
Altitude | 2000m | |
Noise | ≤60dB | |
Heat dissipation mode | Air cooling | |
Operating interface | 7 "touch screen | |
Charging mode | Automatic charging, fixed power, fixed amount, fixed time | |
Method of payment | Pay by card or by code | |
Networking mode | Ethernet, 3G, 4G | |
Photovoltaic parameter | ||
Rated power | 100kW | 50kW |
Input voltage range | DC300V-1000V | DC300V-1000V |
Input current range | 0-333A | 0-167A |
Product Attributes
Product Description
Application scenario
Car parking lot, highway oil station, commercial center, charging station, photovoltaic power station, etc
Product characteristics
1、Technology leadership: photovoltaic technology, energy storage technology, vehicle charging technology, energy storage control technology, energy use interactive technology organic integration, application in one;
2、Energy saving and high effiffifficiency: the charging effiffifficiency is greater than 95%, including the charging conversion effiffifficiency of power grid, energy storage or photovoltaic to electric vehicles;
3、Easy installation and expansion: adopt integrated design concept, easy installation;
4、High safety, cluster one management, to avoid intercluster circulation, DC short circuit and other safety hazards;
5、There are various strategies, which can be controlled according to "time period", "energy proportion", "actual conditions" and other modes.
Production Certification
FAQ
Q1: Are you trading company or manufacturer?
A: We are a professional electric car charger manufacturer and source factory.
Q2: what is the lead time?
A: Usually, 15-20 working days to produce.
Q3: Can we ask you to print our logo into chargers? Can the color of the plug and wire be customized according to our requirements?
A: Yes. We support OEM/ODM production.
Q4: How about your product quality? What should I do if something goes wrong?
A: First of all, we sell our products for many years, and we have a professional engineering team in this field. Moreover, our products have been strictly inspected and repeatedly tested before leaving the factory, and the good and good rate of the varieties has reached 99.98%. Finally, we have service providers in some areas, please contact us for more information
Q5: What is your quality control system?
A: Complete all incoming material inspection, process inspection, and final inspection; 30 test procedures will be done before the goods leave the factory, and charging test videos will be sent; products have CE, ROHS, FCC, UL, KC certification.
Q6: Can I install the EV charger by myself?
A: Yes, but we suggest the user contact a professional electrician for installation to avoid potential safety hazards.
Q7:Why my charging power is lower than the specification?e?
A: Because during the charging session, a few factors will influence the output. Here is some potential reason:
①The BMS(Battery management system) of the car controls the charging session. ②The Max allowed current was set and limited through your APP. For more details, please query us at sales@hjlcharger.comQ8: How much time is required to fully charge my car using this charger?
A: The charging speed is determined by three factors working in conjunction: the On Board Charging (OBC) System, the maximum current allowed by the charging cable, and the EVSE. As an illustration, if the EV's maximum allowed power is 30KW and the battery capacity is 60KWh, it would take approximately 2 hours to charge the battery fully.
Q9: What is dynamic load balancing and why do I need that?
A: Dynamic load balancing is a technique that distributes the electrical load across multiple charging stations based on real-time demand. This helps prevent the electrical grid's overload and ensures that each charging station receives appropriate power.
Dynamic load balancing technology can help distribute the available power among multiple EV chargers in real-time, optimizing available power and reducing the risk of overloading the grid. This can help prevent power outages and reduce the need for costly grid upgrades. Additionally, dynamic load Balancing can help reduce charging times and improve the overall charging experience for EV drivers, making it a valuable feature for both residential and commercial charging applications.