+86 18924678741

battery-swapping systems for Electric Tricycle

Power 3KW/5KW/7KW
Display LED/Digital tube
Installation Ground-Mounted
Equipment size 550*430*1468/820*600*1600/1200*600*1600(mm)
Input voltage range 180~264V/Ac
Output current range 10A
Output voltage range 43~75VDC
IP rating IP54
Working Temp -25℃~+55℃
protocol OCPP 1.6J Protocol
Network selection 4G/Network cable
Protect

Lightning protection and waterproof protection

Get last price

Product Attributes

The battery-swapping systems for Electric Tricycle (electric tricycle battery charging and swapping cabinet) has 4, 8, and 12 ports available, suitable for electric motorcycles, electric bicycles, electric scooters and other two-wheeled/three-wheeled electric vehicles, and can quickly replace discharged electric bicycle or motorcycle batteries.

The electric tricycle battery replacement system is mainly a battery replacement facility designed for electric tricycles, electric motorcycles and other electric models. It realizes the functions of automatic identification, automatic charging, automatic allocation and automatic replacement of batteries through an intelligent management system, providing convenient and efficient battery replacement services for electric tricycle users.

The 4, 8, and 12-port battery-swapping systems for Electric Tricycle product technology is as follows:

Product number

MHL04A-DC

MHL08A-DC

MHL12A-DC

Detailed specifications

Rated power

3KW

5KW

7KW

Charging equipment

User Interface

LED/Digital tube

Bin size

225*250*400(mm)

Equipment size

550*430*1468(mm)

820*600*1600(mm)

1200*600*1600(mm)

Input voltage

180~264V/Ac

AC220V

Input frequency

45~66Hz

Charging port

2+6 plug wire

The output voltage

43~75VDC

Output current

0-10A

10A

0-10A

Equipment weight

65Kg

100Kg

150Kg

Fire fighting method

Aerosol fire extinguishing

Electrical indicators

Current limiting protection value

≥110%

Voltage regulation accuracy

≤±0.5%

Steady current accuracy

≤±0.5%

Ripple factor

≤±0.5%

Efficiency

≥93%

≥92%

≥93%

Power factor

≥0.99 (over 50% load)

Harmonic content THD

≤5% (over 50% load)

Charging mode

Scan code

Payment method

Scan code payment

Networking method

4G/Network cable

Security function

Overvoltage protection, undervoltage protection, overload protection, short circuit protection, grounding protection, over temperature protection, low temperature protection, lightning protection

Environmental indicators

Operating temperature

-25℃~+55℃

Working humidity

5%~95% non-condensing cream

Working altitude

<2000m

Degree of protection

IP54

Cooling method

Air cooled

Noise control

≤60dB

MTBF

100,000 hours

Product Description

The following is some introduction to the battery-swapping systems for Electric Tricycle:

1. Main functions

1.1. Fast battery replacement: The user only needs to put the low-power battery into the battery replacement cabinet, and the system will automatically identify and allocate a fully charged battery for replacement. The whole process is fast and convenient, which greatly saves the user's time.

1.2. Safe charging: The battery replacement cabinet has multiple built-in safety protection devices to ensure the safety of the battery during charging. At the same time, through the intelligent management system, the safety status of the battery can be monitored around the clock and the harm can be eliminated before it occurs.

1.3. Energy saving and environmental protection: The battery swap cabinet adopts high-efficiency charging technology to effectively reduce energy consumption and reduce carbon emissions. At the same time, through centralized management of batteries, the utilization rate and cycle life of the battery are improved, further promoting energy conservation and environmental protection.

1.4. Intelligent management: The battery swap cabinet is equipped with an intelligent management system, which can monitor and analyze the use of batteries in real time and provide users with accurate battery maintenance suggestions and services. At the same time, through data analysis, the distribution and scheduling of batteries can be optimized to improve the efficiency of battery replacement.

2. Battery-swapping systems for Electric Tricycle project display

Battery-swapping systems for Electric Tricycle project

Battery-swapping systems for Electric Tricycle project

Battery-swapping systems for Electric Tricycle project

Production Certification

Battery-swapping systems for Electric Tricycle production certification

FAQ

Q1: Are you trading company or manufacturer?

A: We are a professional electric car charger manufacturer and source factory.

Q2: what is the lead time?

A: Usually, 15-20 working days to produce.

Q3: Can we ask you to print our logo into chargers? Can the color of the plug and wire be customized according to our requirements?

A: Yes. We support OEM/ODM production.

Q4: How about your product quality? What should I do if something goes wrong?

A: First of all, we sell our products for many years, and we have a professional engineering team in this field. Moreover, our products have been strictly inspected and repeatedly tested before leaving the factory, and the good and good rate of the varieties has reached 99.98%. Finally, we have service providers in some areas, please contact us for more information

Q5: What is your quality control system?

A: Complete all incoming material inspection, process inspection, and final inspection; 30 test procedures will be done before the goods leave the factory, and charging test videos will be sent; products have CE, ROHS, FCC, UL, KC certification.

Q6: Can I install the EV charger by myself?

A: Yes, but we suggest the user contact a professional electrician for installation to avoid potential safety hazards.

Q7:Why my charging power is lower than the specification?e?

A: Because during the charging session, a few factors will influence the output. Here is some potential reason:

①The BMS(Battery management system) of the car controls the charging session.

②The Max allowed current was set and limited through your APP.

For more details, please query us at sales@hjlcharger.com

Q8: How much time is required to fully charge my car using this charger?

A: The charging speed is determined by three factors working in conjunction: the On Board Charging (OBC) System, the maximum current allowed by the charging cable, and the EVSE. As an illustration, if the EV's maximum allowed power is 30KW and the battery capacity is 60KWh, it would take approximately 2 hours to charge the battery fully.

Q9: What is dynamic load balancing and why do I need that?

A: Dynamic load balancing is a technique that distributes the electrical load across multiple charging stations based on real-time demand. This helps prevent the electrical grid's overload and ensures that each charging station receives appropriate power.

Dynamic load balancing technology can help distribute the available power among multiple EV chargers in real-time, optimizing available power and reducing the risk of overloading the grid. This can help prevent power outages and reduce the need for costly grid upgrades.

Additionally, dynamic load Balancing can help reduce charging times and improve the overall charging experience for EV drivers, making it a valuable feature for both residential and commercial charging applications.

Recommended Reading

Hot Products

Get In Touch With Us

Whenever you need us, we're here for you. --- Contact us for all your support needs, from technology, general queries to information support, etc. Our hotline numbers and e-mail are open 24hx7d for your needs.

Copyright © 2023.Shenzhen Hongjiali New Energy Co., Ltd All rights reserved. Site Map back to home