EVs can be charged using electric vehicle service equipment (EVSE) operating at different charging speeds.
DC fast and ultra-fast charging stations for electric vehicles (EV) charge directly to the battery, decreasing charging times, and fixing range anxiety.
Hongjiali New Energy electric vehicle (EV) chargers deliver a fast, cost-effective charge. Make smart, sustainable transportation a reality at home, work and on the go.
Ultra-fast chargers are the fastest way to charge electric vehicles and are usually installed at motorway services or close to main routes.
Top electric vehicle fast charging solutions, consult us online today!
EV fast charger product parameter introduction:
Parameters | Requirements | ||
General Requirements | |||
EV Charger Type | DC | ||
Charger Capacity | 240KW | 360KW | 480KW |
Equipment size | L1200*W750*H1980(mm) | ||
Product Model NO. | ENC-DCF240D | ENC-DCF360F | ENC-DCF480H |
ANSI-DCF240D | ANSI-DCF360F | ANSI-DCF480H | |
JIS-DCF240D | JIS-DCF360F | JIS-DCF480H | |
Mounting | Ground-Mounted(Sequential) | ||
Input Requirements | |||
AC Supply System | Three-Phase, 5 Wire AC system | ||
Nominal Input Voltage | AC380V±15% | ||
Input Frequency | 45-65Hz | ||
Environmental Requirements | |||
Ambient Temperature Range | -25 to 55°C | ||
Ambient Humidity | 5 to 95% | ||
Storage Temperature | -40 to 70°C | ||
Electrical indicators | |||
Current Limit Protection Value | ≥110% | ||
Steady pressure precision | ≤±0.5% | ||
Steady flow accuracy | ≤±1% | ||
Power Factor | ≥0.99(50% load above) | ||
Mechanical Requirements | |||
IP Ratings | IP 54 | ||
Cooling | Air-cooled | ||
Output Requirements | |||
Connector Terminal | 2 | 3 | 4 |
Number of Outputs | 4 | 6 | 8 |
Type of Each Output | DC200-750V ; DC150-500V(JIS) | ||
Single Output Max.Current | 200 Amp | ||
Equipment size | L430*W201*H1600(mm) | ||
User Interface & Display Requirements | |||
Display & Touch-Screen Size | 7 Inches Touch Screen with Shell | ||
User Authentication | QR Code/RFID Card /Password Login | ||
Metering Information | Consumption Units | ||
Communication Requirements | |||
Communication between EVSE and Central server | OCPP 1.6J Protocol (Optional) | ||
Interface between Charger and CMS | Ethernet/3G/4G/WIFI (Optional) | ||
Protection & Safety Requirements | |||
Executive Standard | IEC 62196 2017, IEC 61851 2017, SAE J1772,CHAdeMO etc. | ||
Safety Parameters | Over Current, Over Voltage, Under Voltage, Residual Current, Surge Protection, Leakage Protection, Short Circuit, Over Temperature, etc. |