+86 18924678741

2*22KW ground mounted AC Chargring Pile

Power 22KW
Display 4.3 Inches Touch Screen
Installation Ground-Mounted
Equipment size L340*W201*H1500(mm)
Input voltage range AC380V±15%
Output current range 32 Amp/16 Amp(ENC)/50 Amp(ANSI)
Output voltage range AC380V±15%
IP rating IP 54
Working Temp -25 to 55°C
protocol OCPP 1.6J Protocol (Optional)
Network selection Ethernet/3G/4G/WIFI (Optional)
Protect

water proof

Get last price

Product Attributes

Input Frequency50Hz, ±1.5Hz / 60Hz, ±1.5Hz

Output Current Range32 Amp

Output Voltage380~400V ± 15%

sizeL340*W215*H1500(mm)

Rated Output Power2*22KW

Product Description


22kwx2 Jpg

2*22KW ground mounted AC Chargring Pile Applicable Scenes:

They are suitable for occasions such as city special chargingstations that provide charging for bus, taxi,public service vehicles, sanitation vehicles, logistics vehicles, etc.; city public charging stations that provide charging for private cars, commuter, bus;intercity highway charging stations and other occasions that need special AC fast charging.

2*22KW ground mounted AC Chargring Pile Technical Data

Parameters

Requirements

Ev Charger Type

AC

Charger Capacity

22KW*2

Model No.

ENC-ACL044A / SAE- ACL044A

Mounting

Column type/Wall-mounted

AC Supply System

Three-Phase, 5 Wire AC system

Nominal Input voltage

380~400V ± 15%

Input frequency

50Hz, ±1.5Hz / 60Hz, ±1.5Hz

Ambient Temperature

Range

-25 to 55°C

Ambient Humidity

5 to 95%

Storage temperature

-40 to 70°C

IP Ratings

IP 54

Cooling

Air cooled

Number of outputs

2

Type of each output

380~400V ± 15% three phase, 32Amp

Output Current

32 Amp

Output Connector

Compatibility

SAE J1772 Type-1, IEC621196-2,Mode3,type2

Display & touch-screen size

4.3 inches/7inches

User Authentication

Mobile application or User interface / QR Code/RFID Card /Password Login

Metering Information

Consumption Units

Communication between

EVSE and Central Server

OCPP 1.6J protocol
(optional)

Interface between charger

and CMS

Ethernet and GPRS Modem

Safety Parameters

Over current, under voltage, Residual current, Surge protection, leakage protection,

Short circuit, Over temperature, etc.

Power failure

If there is a power failure, user is indicated about this.

2*22KW ground mounted AC Chargring Pile Features:
1、Delicate appearance, simple operation, convenient installation;
2、High efficiency, reliable and stable performance;
3、Friendly interaction interface, 4.3-inch/7 inch color touch screen(optional);
4、Support multiple modes of charging, operation management and payment;
5、Support Ethernet or wireless telecommunication;
6、Support RFID Card/OCPP 1.6J (optional);
7、Support Type-2/type-1 connector(or Socket)optional;
8、Overload integrated Protection;
9、Support online data upgrade.


Production Certification

7kw-22kw.jpg

FAQ

Q1: Are you trading company or manufacturer?

A: We are a professional electric car charger manufacturer and source factory.

Q2: what is the lead time?

A: Usually, 15-20 working days to produce.

Q3: Can we ask you to print our logo into chargers? Can the color of the plug and wire be customized according to our requirements?

A: Yes. We support OEM/ODM production.

Q4: How about your product quality? What should I do if something goes wrong?

A: First of all, we sell our products for many years, and we have a professional engineering team in this field. Moreover, our products have been strictly inspected and repeatedly tested before leaving the factory, and the good and good rate of the varieties has reached 99.98%. Finally, we have service providers in some areas, please contact us for more information

Q5: What is your quality control system?

A: Complete all incoming material inspection, process inspection, and final inspection; 30 test procedures will be done before the goods leave the factory, and charging test videos will be sent; products have CE, ROHS, FCC, UL, KC certification.

Q6: Can I install the EV charger by myself?

A: Yes, but we suggest the user contact a professional electrician for installation to avoid potential safety hazards.

Q7:Why my charging power is lower than the specification?e?

A: Because during the charging session, a few factors will influence the output. Here is some potential reason:

①The BMS(Battery management system) of the car controls the charging session.

②The Max allowed current was set and limited through your APP.

For more details, please query us at sales@hjlcharger.com

Q8: How much time is required to fully charge my car using this charger?

A: The charging speed is determined by three factors working in conjunction: the On Board Charging (OBC) System, the maximum current allowed by the charging cable, and the EVSE. As an illustration, if the EV's maximum allowed power is 30KW and the battery capacity is 60KWh, it would take approximately 2 hours to charge the battery fully.

Q9: What is dynamic load balancing and why do I need that?

A: Dynamic load balancing is a technique that distributes the electrical load across multiple charging stations based on real-time demand. This helps prevent the electrical grid's overload and ensures that each charging station receives appropriate power.

Dynamic load balancing technology can help distribute the available power among multiple EV chargers in real-time, optimizing available power and reducing the risk of overloading the grid. This can help prevent power outages and reduce the need for costly grid upgrades.

Additionally, dynamic load Balancing can help reduce charging times and improve the overall charging experience for EV drivers, making it a valuable feature for both residential and commercial charging applications.

Recommended Reading

Get In Touch With Us

Whenever you need us, we're here for you. --- Contact us for all your support needs, from technology, general queries to information support, etc. Our hotline numbers and e-mail are open 24hx7d for your needs.

Copyright © 2023.Shenzhen Hongjiali New Energy Co., Ltd All rights reserved. Site Map back to home