+86 18924678741

ev charging infrastructure

Power 100KW/120KW
Display 7 Inches Touch Screen with Shell
Installation Ground-Mounted
Equipment size L700*W450*H1680(mm)
Input voltage range AC380V±15%
Output current range 200 Amp
Output voltage range DC200-750V / DC150-500V(JIS)
IP rating IP 54
Working Temp -25 to 55°C
protocol OCPP 1.6J Protocol (Optional)
Network selection Ethernet/3G/4G/WIFI (Optional)
Protect

Waterproof, lightning protection

Get last price
Product Attributes

Analyze your EV infrastructure and identify key EV charging station locations. learn more. Fast, safe and interoperable electric vehicle charging solutions made in China.

Hongjiali provides seamless asset management for operators and service providers. 100% white label and secure. Unleash your potential with next-generation charging solutions tailored to your business needs.

Provide electric vehicle charging infrastructure for tenants, residents and guests. From installation to ongoing care, we are your partner every mile. Increase property income. Offer 100% rebate. 24/7 support. Amenities: Turnkey installation, 24/7 support, Level 2 & DCFC.

Electric Vehicle Charging Infrastructure Product Parameters:

Parameters

Requirements

General Requirements

EV Charger Type

DC

Charger Capacity

100KW

120KW

Equipment size

L700*W450*H1680(mm)

Product Model NO.

ENC-DCL100B

ANSI-DCL100B

JIS-DCL100B

ENC-DCL120B

ANSI-DCL120B

JIS-DCL120B

Mounting

Ground-Mounted

Input Requirements

AC Supply System

Three-Phase, 5 Wire AC system

Nominal Input Voltage

AC380V±15%

Input Frequency

45-65Hz

Environmental Requirements

Ambient Temperature Range

-25 to 55°C

Ambient Humidity

5 to 95%

Storage Temperature

-40 to 70°C

Mechanical Requirements

IP Ratings

IP 54

Cooling

Air-cooled

Output Requirements

Number of Outputs

2

Type of Each Output

DC200-750V

DC150-500V(JIS)

Single Output Max.Current

200 Amp

Power Factor

≥0.99(50% load above)

User Interface & Display Requirements

Display & Touch-Screen Size

7 Inches Touch Screen with Shell

User Authentication

QR Code/RFID Card /Password Login

Metering Information

Consumption Units

Communication Requirements

Communication between EVSE and Central server

OCPP 1.6J Protocol (Optional)

Interface between Charger and CMS

Ethernet/3G/4G/WIFI (Optional)

Protection & Safety Requirements

Executive Standard

IEC 62196 2017, IEC 61851 2017, SAE J1772,CHAdeMO etc.

Safety Parameters

Over Current, Over Voltage, Under Voltage, Residual Current, Surge Protection, Leakage Protection, Short Circuit, Over Temperature, etc.

Product Description

EV Charging Infrastructure Features:

1Simple operation, convenient installation;

2High effiffifficiency, reliable and stable performance;

3Friendly interaction interface,7inch color touch screen;

4Support multiple modes of charging, operation management and payment;

5Support 3G/4G,Ethernet or wireless telecommunication;

6Support RFID Card/OCPP 1.6J (optional);

7Support GBT/CCS-2/CCS-1/CHAdeMO connector(or Socket)(optional);

8Overload integrated Protection;

9Support online data upgrade.

EV Charging Infrastructure Applicable Scenes:

They are suitable for occasions such as city special charging stations that provide charging for bus, taxi, public service vehicles, sanitation vehicles,logistics vehicles, etc.; city public charging stations that provide charging for private cars, commuter, bus; intercity highway charging stations and other occasions that need special DC fast charging.

EV Charging Infrastructure Projects:

30kw-120kw-430kw-120kw-5160kw-240kw-4

Production Certification

160kw.jpg

FAQ

Q1: Are you trading company or manufacturer?

A: We are a professional electric car charger manufacturer and source factory.

Q2: what is the lead time?

A: Usually, 15-20 working days to produce.

Q3: Can we ask you to print our logo into chargers? Can the color of the plug and wire be customized according to our requirements?

A: Yes. We support OEM/ODM production.

Q4: How about your product quality? What should I do if something goes wrong?

A: First of all, we sell our products for many years, and we have a professional engineering team in this field. Moreover, our products have been strictly inspected and repeatedly tested before leaving the factory, and the good and good rate of the varieties has reached 99.98%. Finally, we have service providers in some areas, please contact us for more information

Q5: What is your quality control system?

A: Complete all incoming material inspection, process inspection, and final inspection; 30 test procedures will be done before the goods leave the factory, and charging test videos will be sent; products have CE, ROHS, FCC, UL, KC certification.

Q6: Can I install the EV charger by myself?

A: Yes, but we suggest the user contact a professional electrician for installation to avoid potential safety hazards.

Q7:Why my charging power is lower than the specification?e?

A: Because during the charging session, a few factors will influence the output. Here is some potential reason:

①The BMS(Battery management system) of the car controls the charging session.

②The Max allowed current was set and limited through your APP.

For more details, please query us at sales@hjlcharger.com

Q8: How much time is required to fully charge my car using this charger?

A: The charging speed is determined by three factors working in conjunction: the On Board Charging (OBC) System, the maximum current allowed by the charging cable, and the EVSE. As an illustration, if the EV's maximum allowed power is 30KW and the battery capacity is 60KWh, it would take approximately 2 hours to charge the battery fully.

Q9: What is dynamic load balancing and why do I need that?

A: Dynamic load balancing is a technique that distributes the electrical load across multiple charging stations based on real-time demand. This helps prevent the electrical grid's overload and ensures that each charging station receives appropriate power.

Dynamic load balancing technology can help distribute the available power among multiple EV chargers in real-time, optimizing available power and reducing the risk of overloading the grid. This can help prevent power outages and reduce the need for costly grid upgrades.

Additionally, dynamic load Balancing can help reduce charging times and improve the overall charging experience for EV drivers, making it a valuable feature for both residential and commercial charging applications.

Recommended Reading

Get In Touch With Us

Whenever you need us, we're here for you. --- Contact us for all your support needs, from technology, general queries to information support, etc. Our hotline numbers and e-mail are open 24hx7d for your needs.

Copyright © 2023.Shenzhen Hongjiali New Energy Co., Ltd All rights reserved. Site Map back to home