+86 18924678741

120 kw DC fast charger

Power 120kw
Display 7 Inches Touch Screen with Shell
Installation Ground-Mounted
Equipment size L720*W401*H2000mm / L700*W450*H1680mm
Input voltage range AC380V±15%
Output current range 200/250 Amp
Output voltage range DC200-1000V
IP rating IP 54
Working Temp -25 to 55°C
protocol OCPP 1.6J Protocol (Optional)
Network selection Ethernet/3G/4G/WIFI (Optional)
Protect

Over Current, Over Voltage, Under Voltage, Residual Current, Surge Protection, Leakage Protection, Short Circuit, Over Temperature, etc.

Get last price
Product Attributes

The 120kW DC fast charger, also known as "120kW DC fast charger", is a high-power electric vehicle charging device designed to meet the needs of fast charging. The basic technical parameters of the 120 kW DC fast charger are as follows:

Maximum output power: 120kW

Output voltage range: 200V~1000VDC (the specific range varies depending on the product model)

Maximum output current: 220A/250A (depending on the specific model)

Charging interface standard: ‌‌‌‌GBT, CCS2, CCS1, ChAdeMO

Use environment: suitable for outdoor environment, with dust and water resistance level (IP54)

Input voltage type: three-phase five-wire (3P+N+PE), input voltage range is 380VAC±15%

AC grid frequency: 45Hz~65Hz

Efficiency: up to 94% or more

Product Description

I. Technical features

High power output: The 120kW DC fast charger can provide up to 120kW of charging power, which can quickly replenish the battery of electric vehicles in a short time.

High-efficiency power conversion: Using advanced IGBT (insulated gate bipolar transistor) modules and high-efficiency power conversion technology, the AC power of the power grid is efficiently converted into DC power, which is directly supplied to the electric vehicle battery, thereby shortening the charging time.

Intelligent control: The built-in intelligent control system can monitor the battery status in real time and dynamically adjust the charging strategy according to the battery status to ensure the safety and efficiency of the charging process.

2. Application scenarios

Public charging stations: As an important part of the urban charging network, 120-kilowatt DC fast chargers can significantly improve the service capabilities of charging stations, reduce the waiting time of car owners, and improve user experience.

Commercial complexes: Deployed in shopping malls, hotels, office buildings and other commercial complexes, it provides convenient charging services for electric vehicle owners who come to consume or work, and enhances the service competitiveness of commercial facilities.

Logistics parks: In response to the demand for electric vehicles in the logistics industry, 120-kilowatt DC fast chargers can efficiently meet the rapid energy replenishment needs of multiple logistics vehicles and improve operational efficiency.

Residential communities: Although limited by the capacity of the power grid, some high-end communities or newly built communities can introduce 120-kilowatt DC fast chargers through capacity expansion and transformation to provide residents with fast charging options other than home charging piles.

3. Advantages and characteristics

Efficient charging: High power output greatly shortens charging time and improves charging efficiency.

Intelligent management: Supports remote monitoring, fault diagnosis, automatic settlement and other functions, reduces operation and maintenance costs, and improves management efficiency.

Flexible configuration: The working mode can be adjusted according to actual needs to meet the charging needs in different scenarios.

Safety protection: It has multiple safety protection mechanisms, including overcurrent protection, overvoltage protection, short circuit protection, etc., to ensure the safety and reliability of the charging process.

Environmental protection and energy saving: It adopts high-efficiency power conversion technology to reduce energy loss, which is in line with the development trend of green and low-carbon.

4. Instructions for use

Operation interface: Equipped with a human-computer interaction interface for setting charging methods, charging process parameters, etc.

Charging process: Users can start the charging process by swiping a card, scanning a code, etc., and the charging monitoring unit will complete the start, operation, real-time monitoring and shutdown of charging.

Maintenance and care: Regularly check the working status of the charging equipment to ensure that the equipment is in good operating condition. If there is a fault or abnormality, contact a professional for repair in time.

5. Case display of 120 kW DC fast charger project

120 kW DC fast charger project

120 kW DC fast charger project

120 kW DC fast charger project

Production Certification

120 kW DC fast charger Production Certification

FAQ

Q1: Are you trading company or manufacturer?

A: We are a professional electric car charger manufacturer and source factory.

Q2: what is the lead time?

A: Usually, 15-20 working days to produce.

Q3: Can we ask you to print our logo into chargers? Can the color of the plug and wire be customized according to our requirements?

A: Yes. We support OEM/ODM production.

Q4: How about your product quality? What should I do if something goes wrong?

A: First of all, we sell our products for many years, and we have a professional engineering team in this field. Moreover, our products have been strictly inspected and repeatedly tested before leaving the factory, and the good and good rate of the varieties has reached 99.98%. Finally, we have service providers in some areas, please contact us for more information

Q5: What is your quality control system?

A: Complete all incoming material inspection, process inspection, and final inspection; 30 test procedures will be done before the goods leave the factory, and charging test videos will be sent; products have CE, ROHS, FCC, UL, KC certification.

Q6: Can I install the EV charger by myself?

A: Yes, but we suggest the user contact a professional electrician for installation to avoid potential safety hazards.

Q7:Why my charging power is lower than the specification?e?

A: Because during the charging session, a few factors will influence the output. Here is some potential reason:

①The BMS(Battery management system) of the car controls the charging session.

②The Max allowed current was set and limited through your APP.

For more details, please query us at sales@hjlcharger.com

Q8: How much time is required to fully charge my car using this charger?

A: The charging speed is determined by three factors working in conjunction: the On Board Charging (OBC) System, the maximum current allowed by the charging cable, and the EVSE. As an illustration, if the EV's maximum allowed power is 30KW and the battery capacity is 60KWh, it would take approximately 2 hours to charge the battery fully.

Q9: What is dynamic load balancing and why do I need that?

A: Dynamic load balancing is a technique that distributes the electrical load across multiple charging stations based on real-time demand. This helps prevent the electrical grid's overload and ensures that each charging station receives appropriate power.

Dynamic load balancing technology can help distribute the available power among multiple EV chargers in real-time, optimizing available power and reducing the risk of overloading the grid. This can help prevent power outages and reduce the need for costly grid upgrades.

Additionally, dynamic load Balancing can help reduce charging times and improve the overall charging experience for EV drivers, making it a valuable feature for both residential and commercial charging applications.

Recommended Reading

Get In Touch With Us

Whenever you need us, we're here for you. --- Contact us for all your support needs, from technology, general queries to information support, etc. Our hotline numbers and e-mail are open 24hx7d for your needs.

Copyright © 2023.Shenzhen Hongjiali New Energy Co., Ltd All rights reserved. Site Map back to home