+86 18924678741

5 meters new energy electric vehicle charging pile

Power 30/60/120/180/240KW
Display 7 Inches Touch Screen with Shell
Installation vertical
Equipment size L720*W401*H2000(mm)/L700*W450*H1680(mm)
Input voltage range AC380V±15%
Output current range 125/200/250 Amp
Output voltage range 200-1000VDC
IP rating IP 54
Working Temp -25 to 55°C
protocol OCPP 1.6J Protocol (Optional)
Network selection Ethernet/3G/4G/WIFI (Optional)
Protect

Over Current, Over Voltage, Under Voltage, Residual Current, Surge Protection, Leakage Protection, Short Circuit, Over Temperature, etc.

Get last price
Product Attributes

5 meters new energy electric vehicle charging pile input voltage AC380V±15%, input frequency 45-65HZ, rated output power 30KW, 60KW, 120KW, 180KW, 240KW, cable length 5 meters (support different options), support OCPP1.6, 4G, Ethernet, Wi-Fi, 7-inch touch screen, suitable for retail, apartments, residences, hotels, workplaces and retail places, providing next-generation electric vehicle charging and energy management solutions for electric vehicle drivers, operators, enterprises and municipalities.

5 meters new energy electric vehicle charging pile 30KW, 60KW, 120KW, 180KW, 240KW product technical parameters are as follows:

Parameters

Requirements

General Requirements

EV Charger Type

DC

Charger Capacity

30KW

60KW

120KW

180KW

240KW

Equipment size

L700*W450*H1680(mm)

L750*W750*H1920(mm)

Product Model NO.

ENC-DCL030A

ENC-DCL060A/B

ENC-DCL120B

ENC-DCL180B

ENC-DCL240B

ANSI-DCL030A

ANSI-DCL060A/B

ANSI-DCL120B

ANSI-DCL180B

ANSI-DCL240B

JIS-DCL030A

JIS-DCL060A/B

JIS-DCL120B

JIS-DCL180B

JIS-DCL240B

Mounting

Ground-Mounted

Input Requirements

AC Supply System

Three-Phase, 5 Wire AC system

Nominal Input Voltage

AC380V±15%

Input Frequency

45-65Hz

Environmental Requirements

Ambient Temperature Range

-25 to 55°C

Ambient Humidity

5 to 95%

Storage Temperature

-40 to 70°C

Mechanical Requirements

IP Ratings

IP 54

Cooling

Air-cooled

Output Requirements

Number of Outputs

1

1 or 2

2

Type of Each Output

200-1000VDC

Single Output Max.Current

125 Amp

200/250 Amp

Power Factor

≥0.99(50% load above)

User Interface & Display Requirements

Display & Touch-Screen Size

7 Inches Touch Screen with Shell

User Authentication

QR Code/RFID Card /Password Login

Metering Information

Consumption Units

Communication Requirements

Communication between EVSE and Central server

OCPP 1.6J Protocol (Optional)

Interface between Charger and CMS

Ethernet/3G/4G/WIFI (Optional)

Protection & Safety Requirements

Executive Standard

IEC 62196 2017, IEC 61851 2017, SAE J1772,CHAdeMO etc.

Safety Parameters

Over Current, Over Voltage, Under Voltage, Residual Current, Surge Protection, Leakage Protection, Short Circuit, Over Temperature, etc.


Product Description

Here is some information about the 5 meters new energy electric vehicle charging pile:

I. Structure and function

Pile body: The pile body of the charging pile is usually made of steel, aluminum alloy and other materials, with strong durability and stability.

Charging module: This is the core part of the charging pile, including components such as charger, controller, power supply, etc. The charger is responsible for converting electrical energy into the electrical energy required by the electric vehicle, while the controller is responsible for controlling the working status of the charger and various parameters during the charging process to ensure the safety and stability of the charging process.

Display screen: used to display the status of the charging pile, charging progress, charging costs and other information.

Connection cable: This is the bridge between the charging pile and the electric vehicle, responsible for transmitting electrical energy and data. The 5-meter connection cable can meet the charging needs of new energy electric vehicles at the charging station.

Safety protection device: The charging pile is equipped with safety protection devices such as leakage protection, overcurrent protection, and overvoltage protection to ensure the safety of the charging pile and electric vehicles.

2. Precautions

Safety first: The charging pile will generate high voltage and high current during use, and safety protection measures should be taken to ensure the safety of users and equipment.

Comply with relevant regulations: When installing and using the charging pile, relevant safety regulations and operating procedures should be followed to ensure the normal operation of the equipment and user rights.

3. 5 meters new energy electric vehicle charging pile project display

5 meters new energy electric vehicle charging pile project

5 meters new energy electric vehicle charging pile project

5 meters new energy electric vehicle charging pile project

Production Certification

5 meters new energy electric vehicle charging pile Production Certification

FAQ

Q1: Are you trading company or manufacturer?

A: We are a professional electric car charger manufacturer and source factory.

Q2: what is the lead time?

A: Usually, 15-20 working days to produce.

Q3: Can we ask you to print our logo into chargers? Can the color of the plug and wire be customized according to our requirements?

A: Yes. We support OEM/ODM production.

Q4: How about your product quality? What should I do if something goes wrong?

A: First of all, we sell our products for many years, and we have a professional engineering team in this field. Moreover, our products have been strictly inspected and repeatedly tested before leaving the factory, and the good and good rate of the varieties has reached 99.98%. Finally, we have service providers in some areas, please contact us for more information

Q5: What is your quality control system?

A: Complete all incoming material inspection, process inspection, and final inspection; 30 test procedures will be done before the goods leave the factory, and charging test videos will be sent; products have CE, ROHS, FCC, UL, KC certification.

Q6: Can I install the EV charger by myself?

A: Yes, but we suggest the user contact a professional electrician for installation to avoid potential safety hazards.

Q7:Why my charging power is lower than the specification?e?

A: Because during the charging session, a few factors will influence the output. Here is some potential reason:

①The BMS(Battery management system) of the car controls the charging session.

②The Max allowed current was set and limited through your APP.

For more details, please query us at sales@hjlcharger.com

Q8: How much time is required to fully charge my car using this charger?

A: The charging speed is determined by three factors working in conjunction: the On Board Charging (OBC) System, the maximum current allowed by the charging cable, and the EVSE. As an illustration, if the EV's maximum allowed power is 30KW and the battery capacity is 60KWh, it would take approximately 2 hours to charge the battery fully.

Q9: What is dynamic load balancing and why do I need that?

A: Dynamic load balancing is a technique that distributes the electrical load across multiple charging stations based on real-time demand. This helps prevent the electrical grid's overload and ensures that each charging station receives appropriate power.

Dynamic load balancing technology can help distribute the available power among multiple EV chargers in real-time, optimizing available power and reducing the risk of overloading the grid. This can help prevent power outages and reduce the need for costly grid upgrades.

Additionally, dynamic load Balancing can help reduce charging times and improve the overall charging experience for EV drivers, making it a valuable feature for both residential and commercial charging applications.

Recommended Reading

Get In Touch With Us

Whenever you need us, we're here for you. --- Contact us for all your support needs, from technology, general queries to information support, etc. Our hotline numbers and e-mail are open 24hx7d for your needs.

Copyright © 2023.Shenzhen Hongjiali New Energy Co., Ltd All rights reserved. Site Map back to home