Product model | CYD34K-40 | CYD65K-40 | CYD132K-120 |
Rated power | 40kW | 40kW | 120kW |
Nominal capacity | 34kWh | 65kWh | 132kWh |
Charge and discharge ratio | ≤1.17C | ≤0.61C | ≤0.90C |
Number of output connectors | 1 | 2 | 2 |
Input charging port | CCS1,CCS2,GBT,CHAdeMO(optional) | CCS1,CCS2,GBT,CHAdeMO(optional) | CCS1,CCS2,GBT,CHAdeMO(optional) |
Output charging port | CCS1,CCS2,GBT,CHAdeMO(optional) | CCS1,CCS2,GBT,CHAdeMO(optional) | CCS1,CCS2,GBT,CHAdeMO(optional) |
Output voltage range | 150~750VDC 220/380VAC | 150~750VDC 220/380VAC | 150~750VDC 220/380VAC |
Battery voltage range | 500~900V | ||
Discharge depth | ≤95%DOD(suggestion) | ||
Number of cycles | >6000 times | ||
Cell type | 3.2V/173Ah, 3.2V/280Ah | ||
Rated frequency | 50Hz | ||
Operating temperature | -20~55℃ | ||
Storage temperature | -30~55℃ | ||
Relative humidity | 5%~95%RH,Non-condensing cream | ||
Altitude | ≤2000m | ||
Noise | ≤60dB | ||
Vehicle type | Minivan | Medium van | Van |
Heat dissipation mode | Air conditioning, air cooling | ||
Protection class | IP54 | ||
Isolation mode | non-isolation |
Product Attributes
Product Description
Mobile battery energy storage system Application scenario:
Road emergency, construction, checkpoint construction, military security, etc.
Mobile battery energy storage system Product characteristics :
1、High power quality, the system port voltage frequency is stable, fully meet the requirements of national standards;
2、Fast startup speed, the system can be stable external power supply within 1 second;
3、Stable and reliable operation, the system based on the company's rich practical engineering
research and development design, from the equipment layer to the system layer technology is
completely controllable;
4、The power supply range is large, the external output power of the system can be flflexibly sliding between 0~120kW, according to the specifific situation scientifific setting;
5、Strong compatibility, the system supports wind and other renewable energy plug and play;
6、Flexible and convenient capacity expansion, the system supports multiple standard modules
running in parallel, flflexible design according to difffferent scenarios;
7、Advanced intelligent management and control, complete protection, can be set according to
difffferent working conditions to fifit the operation control strategy, under the premise of ensuring the load demand, improve the system operation effiffifficiency; It has the function of hierarchical load management
Production Certification
FAQ
Q1: Are you trading company or manufacturer?
A: We are a professional electric car charger manufacturer and source factory.
Q2: what is the lead time?
A: Usually, 15-20 working days to produce.
Q3: Can we ask you to print our logo into chargers? Can the color of the plug and wire be customized according to our requirements?
A: Yes. We support OEM/ODM production.
Q4: How about your product quality? What should I do if something goes wrong?
A: First of all, we sell our products for many years, and we have a professional engineering team in this field. Moreover, our products have been strictly inspected and repeatedly tested before leaving the factory, and the good and good rate of the varieties has reached 99.98%. Finally, we have service providers in some areas, please contact us for more information
Q5: What is your quality control system?
A: Complete all incoming material inspection, process inspection, and final inspection; 30 test procedures will be done before the goods leave the factory, and charging test videos will be sent; products have CE, ROHS, FCC, UL, KC certification.
Q6: Can I install the EV charger by myself?
A: Yes, but we suggest the user contact a professional electrician for installation to avoid potential safety hazards.
Q7:Why my charging power is lower than the specification?e?
A: Because during the charging session, a few factors will influence the output. Here is some potential reason:
①The BMS(Battery management system) of the car controls the charging session. ②The Max allowed current was set and limited through your APP. For more details, please query us at sales@hjlcharger.comQ8: How much time is required to fully charge my car using this charger?
A: The charging speed is determined by three factors working in conjunction: the On Board Charging (OBC) System, the maximum current allowed by the charging cable, and the EVSE. As an illustration, if the EV's maximum allowed power is 30KW and the battery capacity is 60KWh, it would take approximately 2 hours to charge the battery fully.
Q9: What is dynamic load balancing and why do I need that?
A: Dynamic load balancing is a technique that distributes the electrical load across multiple charging stations based on real-time demand. This helps prevent the electrical grid's overload and ensures that each charging station receives appropriate power.
Dynamic load balancing technology can help distribute the available power among multiple EV chargers in real-time, optimizing available power and reducing the risk of overloading the grid. This can help prevent power outages and reduce the need for costly grid upgrades. Additionally, dynamic load Balancing can help reduce charging times and improve the overall charging experience for EV drivers, making it a valuable feature for both residential and commercial charging applications.